Engineering firm paid $42,400 to study its own stormwater ponds after repeated Leland flooding (NC)

The town of Leland paid an engineering company thousands of dollars to study flooding resulting from a project that same company had engineered. It’s a potential conflict of interest that has some questioning the results of the study.  After persistent flooding issues developed around Magnolia Greens in Leland, the town paid Cape Fear Engineering $42,400 to study the effectiveness of the development’s stormwater management system.    Read the article………………

Editor

Recent Posts

Hurricane Preparedness: Beyond the Basics (FL)

As Floridians, the dance of hurricane prep is an annual occurrence. From June to November,…

12 hours ago

Uncovering Asbestos During Condo Refurbishment: Navigating Challenges and Options (ON)

Embarking on a major refurbishment project for a condominium is an exciting endeavor, promising revitalized…

16 hours ago

Enhancing Condo Aesthetics: Window Replacement vs. Repainting Considerations (ON)

In the realm of condominium maintenance and improvement, decisions regarding windows and exterior aesthetics are…

16 hours ago

Big Changes to Condo Record Laws (FL)

If the association is still doing things the old fashioned way and making deposits by…

19 hours ago