On behalf of the Cedar Ridge Homeowner’s Association, attorney Scott Lipson and engineer Bill Erdman of Keystone Engineering presented a report outlining residents’ dissatisfaction with their top soil as left by the developer, THP Homes. They argued that THP did not supply the required eight inches of top soil on the property, with residents finding rocks, sand and other things while doing lawn work. Read the article………………………..
Related Post
October 31, 2018
November 16, 2021
September 15, 2014
Comments are closed.